This guide covers assembly for Premier Magical Mushrooms / Mushroom Spinners. It applies to the Red Polka and Tie Dye designs.
Applies to: Mushroom Spinner - Red Polka and Mushroom Spinner - Tie Dye. See the 2 products this guide covers.
Assembly
Step 1: Unfold the gore panels
Remove gore panels from package and unfold. Make sure that the lower edge binding tape is not twisted or bunched. (Diagram A)
The gore panels form a ring, with gore struts extending upward from the panels. The lower edge binding tape runs around the bottom edge of the ring.

Step 2: Slide in the main rotating assembly
Slide the Main rotating assembly through the center of the ring of gore panels with the support struts all facing up and curved in the same direction.
The main rotating assembly sits in the open center of the gore panels. Keep the support pole below the assembly as you slide it through the ring.

Step 3: Insert the gore struts
Insert the gore struts into the strut holes on the top disc of the main rotating assembly. (Diagram C)
The strut holes are around the top disc of the main rotating assembly. Bring each gore strut inward to its hole so the panels pull up into the mushroom shape.

Step 4: Install the ground stake and support pole
Pound Ground Stake into ground and insert non-ferruled end of Support Pole into Ground Stake. (Diagram D)
The ground stake goes into the ground first. The support pole then points down into the ground stake, with the assembled mushroom spinner above it.

Care note
Please note: Although your Mushroom Spinner is constructed with UV resistant SunTex™ fabric, it is recommended that you take it inside during storms and harsh weather to preserve its durability.


Mushroom Spinner - Red Polka
Mushroom Spinner - Tie Dye
Share:
Morning Rooster Spinner Assembly Instructions
North American Cardinal Spinner Assembly Instructions