Use this guide to assemble and care for Premier 6.5 ft. Wind Generators. It covers the Flames, Open, Patriotic, Rainbow and Sale designs.

Applies to: 6.5 ft. Wind Generator Flames, Open, Patriotic, Rainbow and Sale designs. See the 5 products this guide covers.

Assembly

Step 1: Drive in the support stake

Drive Support Stake into the ground about halfway (1 ½ feet). It is recommended that you use a block of wood or some other padding between the hammer and the Support Stake. (diagram A)

Place the block of wood or other padding on top of the Support Stake before striking it with the hammer. The stake goes straight down into the ground, with about half of it below the surface.

6.5 ft. Wind Generator support stake driven into ground with hammer and block of wood
A. Drive the Support Stake into the ground.

Step 2: Install the struts and sails

Slide Strut into sleeve along edge of Sail, making sure Strut passes through loop of Bungee Tether where it is tied into Sleeve. (diagram B, inset 1) Repeat for other two Struts and Sails. Insert bottom ends of Struts into holes on Hub. Stretch Bungee Sail Retainers on bottom of sleeves into Jamb Slots located near center of Hub to hold Sails securely on Struts. (diagram B, inset 2) Attach clipped end of each Bungee Tether to loop on lower corner of next Sail. (diagram B, inset 3)

Slide each Strut through the Sleeve to the end, then insert the other end into the hole in the Hub. At each Jamb Slot, pull the knot through the center hole of the Jamb Slot, then hook the knot into the top of the Jamb Slot. The clipped end of each Bungee Tether clips onto the loop at the edge of the next Sail.

6.5 ft. Wind Generator sails, struts, bungee tethers, sail retainers and hub
B. Install the struts, sails and bungee connections.

Step 3: Extend the mast and mount the wind generator

Extend the three-sectioned Aluminum Mast Pole, lining up the Buttons on the inner sections with the holes on the outer. Make sure that both Buttons lock firmly into the holes before continuing. Slip the Hub Axle of the completed Wind Generator into the top (the thinnest section) of the extended Aluminum Mast Pole and slide bottom of Aluminum Mast Pole over Support Stake. (diagram C)

The Buttons are at the section joints of the Aluminum Mast Pole. The Hub Axle goes into the thinnest end at the top of the pole, and the bottom of the pole fits down over the Support Stake.

6.5 ft. Wind Generator mast with buttons, support stake and hub axle at the top
C. Extend the mast pole and mount the hub axle.

Care and weather caution

With minimal care, your Wind Generator is designed for years of outdoor use. Occasional lubrication of the Hub will increase spinning efficiency. Use any light grease or medium weight oil.CAUTION: To prolong life of Wind Generator, never leave out in storms, bad weather, or in winds of over 20mph.

Products this guide covers