This guide covers assembly and basic flying instructions for the Premier Dragon Diamond Kite. It includes the spine rods, spreader rods, cross rods, bridle, recommended line, and wind range.
Applies to: Dragon Diamond Kite. See the 1 products this guide covers.
Dragon Diamond Kite specs
| Size | Wind range | Line | Frame |
|---|---|---|---|
| 65 x 226 in. / 163 x 565 cm. | 5 ~ 18 mph | 80 lb. Test Line Recommended; not included | Carbon & Fiberglass |
Assembly
Step 1: Lay out the kite
Unroll kite and lay out flat face down.
Step 2: Join the spine rods
Attach pre-inserted Top Spine Rod to pre-inserted Bottom Spine Rod at ferrule. Make sure top of assembled Spine Rod is fit snugly into pocket at top of kite body and tighten and close Velcro Pocket at bottom of kite body. (diagram A)
The Top Spine Rod runs up to the pocket at the top of the kite body, and the Bottom Spine Rod comes up from the lower body. The ferrule is the joining point between the two spine rods, and the Velcro Pocket is at the bottom of the kite body.

Step 3: Install the spreader rods
Slide (shorter) Lower Spreader Rod underneath Velcro Pocket and into pockets at both edges of lower kite body. Slide (longer) Middle Spreader Rod under Spine Rod and into pockets at both edges of middle kite body. (diagram A)
The Lower Spreader Rod sits by the bottom Velcro Pocket, and the Middle Spreader Rod spans the wider middle body. Each end goes into the pocket at the matching edge of the kite body.
Step 4: Attach the cross rods
Insert ends of Cross Rods without Arrow Nocks into Dihedral on Spine Rod. Hook Arrow Nock ends of Cross Rods onto Bead Tensioners at edges of kite body and tension as needed. (diagram B)
The Cross Rods run from the Dihedral on the Spine Rod out to the Bead Tensioners at the edges of the kite body. The Arrow Nock is on the outer end of each Cross Rod, not the end that goes into the Dihedral.

Step 5: Install the cross rod support bar
Insert ends of Cross Rod Support Bar into connectors on assembled Cross Rod. (diagram B)
The Cross Rod Support Bar fits between the connectors on the assembled Cross Rods. The connectors sit on the Cross Rods, one on each side of the Spine Rod.
Step 6: Pull the bridle through and attach line
Make sure Bridle is pulled completely through front of sail, attach line to Bridle, and your Dragon Diamond is ready to fly!
Flight instructions
Step 1: Tie on the flying line
Tie flying line to Tow Loop.
Step 2: Have a friend hold the kite
Have a friend stand about 75 ft. downwind from you and hold the kite with its head pointed towards the sky.
Your friend is downwind from you. The kite’s head points towards the sky while your friend holds it.
Step 3: Release the kite
As the wind catches the kite, signal your friend to release it while you bring in the line with long steady pulls.
Step 4: Let out more line
Slowly let out more line as the kite flies upward.
Line and wind
- Recommended line: 80 LB TEST LINE
- Optimum wind conditions for Dragon Diamond: 5 ~ 18 mph
Beaufort scale
| Condition | Wind [M.P.H.] | Signs |
|---|---|---|
| Calm | 0 | smoke rises vertically |
| Light Air | 1, 2, 3 | Direction of wind shown by smoke, but not by wind vanes |
| Light Breeze | 4, 5, 6, 7 | Wind felt on face, leaves rustle, ordinary vane moves |
| Gentle Breeze | 8, 9, 10, 11, 12 | Leaves and small twigs in constant motion; wind extends light flag |
| Moderate Breeze | 13, 14, 15, 16, 17, 18 | Raises dust and loose paper; small branches move |
| Fresh Breeze | 19, 20, 21, 22, 23, 24 | Small trees & leaves begin to sway; crested wavelets form on inland water |
| Strong Breeze | 25, 26, 27, 28, 29, 30 | Large branches in motion; utility wire whistle; windows rattle |
Wind note
Wind conditions aloft may vary considerably from those found near ground level.


Dragon Diamond Kite
Share:
Dimension X Assembly Instructions
Flo-Tail Delta Assembly Instructions