This guide covers assembly and setup for Premier 9.5 ft. and 12.5 ft. Wind Generators in Patriotic and Rainbow designs. It follows the manufacturer's steps for the support stake, sails, mast, guywires and care.

Applies to: 9.5 ft. and 12.5 ft. Premier Wind Generators, Patriotic and Rainbow. See the 4 products this guide covers.

Specifications

Model Pole height / mast
9.5 ft. Wind Generator - Patriotic and Rainbow 10.5 ft. aluminum mast
12.5 ft. Wind Generator - Patriotic and Rainbow 13.5 ft. aluminum mast

Assembly

Step 1: Drive the support stake

Drive Support Stake into the ground about halfway (1 ½ feet). It is recommended that you use a block of wood or some other padding between the hammer and the Support Stake. (diagram A)

Set the block of wood or padding on top of the Support Stake before hammering. The Support Stake goes straight down into the ground, with about half of it below the surface.

Wind Generator support stake driven into the ground with a block of wood under the hammer
A. Drive the Support Stake into the ground.

Step 2: Assemble the struts, sails and hub

Assemble Struts by inserting non-capped end of capped Outer Strut into ferrule on end of Inner Strut. Slide capped end of Strut into sleeve along edge of Sail, making sure Strut passes through loop of Bungee Tether where it is tied into Sleeve. (diagram B, inset 1) Repeat for other two Struts and Sails. Insert bottom ends of Struts into holes on Hub. Stretch Bungee Sail Retainers on bottom of sleeves into Jamb Slots located near center of Hub to hold Sails securely on Struts. (diagram B, inset 2) Attach clipped end of each Bungee Tether to loop on lower corner of next Sail. (diagram B, inset 3)

The sleeve runs along the edge of each Sail, and the Bungee Tether loop sits inside the sleeve. Pull the Bungee Sail Retainer knot through the center hole of the Jamb Slot, then hook the knot into the top of the Jamb Slot. The clip on each Bungee Tether clips onto the loop at the edge of the next Sail.

Wind Generator sails and struts attached to the hub with bungee retainers and tethers
B. Assemble the Struts, Sails, Hub, Bungee Sail Retainers and Bungee Tethers.

Step 3: Extend the mast and secure the wind generator

Extend the Aluminum Mast Pole, lining up the Buttons on the inner sections with the holes on the outer. Make sure that both Buttons lock firmly into the holes before continuing. Slip the Hub Axle of the completed Wind Generator into the top (the thinnest section) of the extended Aluminum Mast Pole and slide bottom of Aluminum Mast Pole over Support Stake. To further secure Wind Generator see enclosed guywire kit, which includes four lengths of 500 lb. test line with loops tied at each end and four Ground Stakes. Attach one end of each line to D-ring Band and other end to one of the Ground Stakes. Pull each Ground Stake so line is taut and hammer into ground. (diagram C)

Start with the thinnest end of the Aluminum Mast Pole at the top; the Hub Axle goes into that top opening. The bottom of the Aluminum Mast Pole slides down over the Support Stake, and the lines run from the D-ring Band to the Ground Stakes.

Tip: Note: 12 1/2' Wind Generator's Mast Pole will have 4 sections, not 3.

Wind Generator mast with hub axle, D-ring band, lines, support stake and ground stakes
C. Set the Wind Generator on the Aluminum Mast Pole and secure it with lines.

Care and wind warning

With minimal care, your Wind Generator is designed for years of outdoor use. Occasional lubrication of the Hub will increase spinning efficiency. Use any light grease or medium weight oil.

Caution

CAUTION: Never leave Wind Generator out in storms, bad weather, or in winds of over 18mph.

Products this guide covers

Download the original manual

Wind Generator Assembly Instructions (PDF)

Latest Stories

This section doesn’t currently include any content. Add content to this section using the sidebar.